06 · Commissioning and product standardization

From first trial to commercial production.

Trial runs through to stable production, with recipes, ingredients and process settings fixed so every batch matches.

Food technologists testing samples in a quality lab with a glass wall overlooking the production line

Is this for you?

Machines are installed and you need the plant to make saleable product at its rated output, consistently.

What is included

  • Pre-commissioning checks
  • Dry runs and water trials
  • Trial batches with product
  • Performance checks against rated capacity
  • Recipe and process standardization
  • Operator training and standard operating procedures
  • Handover documentation

How it runs

Four steps, each ending in a document.

  1. 01

    Check

    Mechanical completion and safety checks before anything runs.

    Hands overCommissioning reports

  2. 02

    Run

    Dry run, then water trials, then product.

    Hands overStandardized recipes and process settings

  3. 03

    Tune

    Process settings adjusted until product and output are stable.

    Hands overSOPs and training records

  4. 04

    Hand over

    SOPs, training and documentation for the team that will run the plant.

    Hands overHandover file

A question we hear

Who runs the trials?

Trials are run together with the machinery suppliers and your operating team, with us coordinating and recording.

Go deeper · 5 min readCommissioning: from first trial to commercial production
Next stage · 01Project and sector studyYou have an idea, land or a budget.

Planning a food plant? Start with a drawing.

Tell us the product, the capacity you have in mind and where the land is. We’ll come back with how we would approach the detailed project report, at no cost.